Manufacturing Orders
The status of each order and operator.
Home / Industries
From the sales order to the manufacturing order and automatic material consumption, with waste and quality tracking across Saudi production lines.

An Odoo 19 screen with sample data.

The bill of materials (BOM) is defined once and reused on every order. Any engineering change shows up in the theoretical cost before production.
Work orders are scheduled by capacity and available materials, not just the supervisor's guess.
Quality checkpoints at receiving or at the end of the line record rejects and rework, with no side Excel files.
The status of each order and operator.
Components and operations.
Work center capacity.
Inspections and control points.
Linking line breakdowns where needed.
Automatic material issue when an order is closed.

A bill of materials is defined once and used on every manufacturing order, and any engineering change shows in cost before production.
Work orders are scheduled by capacity and available materials, and stock is consumed as work proceeds, so you compare actual with standard cost.
Yes. MRP calculates needs from orders and stock.
Yes, with inventory and accounting integrated.
Yes. Quality and scrap are tracked on the production lines.
Yes. We serve businesses across all regions of Saudi Arabia, from our head office in Riyadh.
One team in two countries studies your operations, tunes the solution and trains your people through go-live.
Book a consultation